IPM Group of Companies




III. BASIC ENVIRONMENTAL SYSTEMS & TECHNOLOGIES, INC.





B.E.S.T. Logo



PHOTOS - Construction of Engineered Sanitary Landfill in Clark Field, Pampanga

  • With the enactment of the National Solid Waste Management Act otherwise known as RA 9003, there is a need to adopt a more professional and "World Class" approach to the disposal of waste. While IPM will continue to increase its waste collection contracts there is now an awareness of the needs and demands of the disposal aspect and to ensure that there is adequate and proper care of the environment. IPM is at the forefront of projects in Engineered Sanitary Landfill Design, Construction and Operation. It has been involved in the development of the first such facility in the Philippines.
  • Lanfill Construction - The only Engineered Landfill in the Philippines














  • State of the art technology "World Class"





  • Construction of the Landfil Liner system, includes HDPE layer and local clay.













  • HDPE Liner





  • Leachate Filter Tank Pipe and Storage





  • Welding Machine for HDPE liner



  • HDPE liner layered on the landfill floor





  • Gravel Layer being placed over HDPE liner








  • Clay laying works and filed density test (for compaction) on the 3 hectare garbage cell.





  • Installation of penetration structure, inspection/collection shaft and piping system for leachate collection and treatment





  • Gravel laying spreading on the 3 hectare garbage cell to act as protection for the HDPE liner and filter for leachate produced by garbage



  • The already operational Clark Engineered Sanitary Landfil project.










<< previous page | back to top | next page >>